What debugging needs to be done before the gas-containing beverage filling machine starts
1. First loosen the nut of the automatic filling machine and then adjust the screw so that the position of the lower fixing rod changes accordingly. As a result, the push-pull length of the syringe is also changed to achieve the purpose of free adjustment of the filling volume. The screw is adjusted clockwise in increments , otherwise it will decrease, and the pointer will indicate.
2. Tighten the nut immediately after adjustment, so that the lower fixing rod and the crank are firmly fixed.
3. Loosen the nut, and determine the correct position of the upper fixing rod according to the push-pull length of different syringes. After the lower fixing rod is adjusted, turn the crank to make the syringe turn to the top dead center, and then lift the outer sleeve of the syringe about 2mm to avoid Push out the needle tube, and then tighten the nut before starting the machine.
4. After the gas-containing beverage filling machine is assembled correctly, turn on the switch. When the machine is working, the crank drives the syringe to pull up and down to pump liquid, adjust the speed knob, select the appropriate filling speed, and start to work normally. Adjust the governor knob clockwise The packing speed is fast, otherwise the speed is slow.
The carbonated beverage production line adopts imported frequency converter to adjust the production speed, and uses pneumatic valve and screw to control the automatic lower cover, and can be equipped with a remote computer control system. It is made of 316 stainless steel, which is corrosion-resistant and easy to clean.